Last update: 07  January  2009 Send to a friend PrintPrint

Elbe Flugzeugwerke GmbH - Facts at a Glance

  • Owner: EADS (100 %)
  • President and CEO: Dr. Andreas Sperl
  • Employees as of end of 2007 (31.12.2007): 1143
  • Turnover 2007: 225,2 Mio €
  • Period needed for aircraft conversion: approx. 4 months
  • Annual capacity:
    • 20 conversions
    • 200 000 sandwich components
  • Plant premises: approx. 250 000 qm
  • Production area: approx. 16 acres
  • Hangar capacity:
    • 6 widebody bays
    • 2 Standard body bays
    • diverse workshops and laboratories

© Elbe Flugzeugwerke GmbH

  • Customers (selection):
    • Federal Express
    • DHL / EAT
    • Royal Jordanian Airlines
    • Qatar Airways
    • Emirates
    • Egypt Air
    • Farner Air Transport
    • Channel Express

© Elbe Flugzeugwerke GmbH

Approvals and Certificates:

Civil and Military Aviation Authorities / Scope of Approval

Scope of Approval Approval-Number
(Aviation Authority)
Design
Supplemental Type Certificate (STC) in accordance with EASA Part 21 Subpart E as well as minor changes and repairs for large and small aircraft (EASA.21J.054)
(EASA)
Production
Airbus Fibre Reinforced Components, Kit-Parts for Airbus Freighter Conversion (DE.21G.0005)
(EASA)
Maintenance
Airbus A300, A310, A319, A320, A321, A330,
Airbus Components
(DE.145.0040)
(EASA)
Airbus A300, A310, A319, A320, A321,
Airbus Components
(E2FY307J)
(FAA)
Airbus A310 (BWB-2481Z-E16/07/01)
(BWB)
In accordance with EASA Approval (QCAA/FAMO/35)
(QCAA / Qatar)
Airbus A300-600 F04900459
(CAAC / China)
In accordance with EASA Approval 804-09
(TCCA / Canada)

Customer

Certificate Approval
Customer requirements: EN9100, QSF-C,   EN9110, CASE e.g. Airbus, Lufthansa, FedEx
EADS JOB-NAVIGATOR

Stock Quotes

DD/MM/YY --:----
Volume--  shares

THE LATEST PRESS RELEASES

06  January  2009

EADS/Airbus Completes Its Aerostructures Strategy

06  January  2009

AEROLIA: Birth Of The French Aerostructures Leader And World No. 2 For Nose Fuselage Subassemblies

02  September  2009

Premium AEROTEC Is Fully Operational

30  December  2008

Airbus Delivers 12 A380s In 2008

Flash Banner